Has anyone been through the process before?

We don't have fibre, but the BT Engineer who installed my ADSL in Jan said they're starting to get fibre sorted soon.

I've been on the BT Openreach tracker thing now, and we're at this stage:




I haven't checked this before, so no idea how long it's taken to get to this stage, however, the place was only build in December.

It says "typically within 9 months". - How accurate is this usually?