MHP (23rd July 2015)
Another update
Put the projector on the ceiling and run the wires properly.
Got a rack for some bits
Still to do
Tidy the rest of the crap.
Organise the wires runnig down then side of the room (trunking already run)
Air conditioning
Decorate
IT stuff to do
Rack another server and firewall
Build Ikea Lack rack to take a cisco lab. Already got a router, just need a few switches.
4 port network card for server 2, only has a 2 port.
Higher powered UPS. Currently only 850va which barely powers the lot as it is.