right heres a bit of an update...
most of this trip offshore in my spare time has been spent sanding down and filling different parts of the light. I smoothed all the outer edges so no harsh right angles. The middle "oil drains" I also smoothed. Basically the oil drains went all the way to the end of each shell, but I filled in the last bit and gave it a bit of a curve.
I secured the central pipe that will hold the small lights (which will get welded on in the next few weeks), and also conceal the wires. There was a small gap (pipe 15mm) and hole 16mm, so I filled the gap in flush with the rest of the shell.
still lots of sanding to go but i can see its starting to take shape. One the lights are on, ill have a little more sanding to do, followed by an all over 80 grit sand and a thorough cleaning before wiring the unit up, then its onto painting.
Social Networking Bookmarks