Following on the success of my lamp project, I've deicded to start work early on my clock. Again this will feature bearings as the main part of the clock, with a camshaft and various flanges and fittings as the base. The clock itself will be store bought, depending on if I can find a suitable design and diameter clock.
Anywhere here is the beginning. I have decided to JB Weld these 2 shells together. I have heard good things about JB Weld (an american product) - http://en.wikipedia.org/wiki/J-B_Weld
Social Networking Bookmarks